• Español
  • Français
  • Italiano
  • Greek

Installations

The existing installations that will be used, and their present composition, are:

  • The CEDER IDGN: this integrates generation systems, storage and consumption in offices and laboratories. Partly developed in SINTER.
  • THE TARAZONA IDGN: formed by two sub-networks, T1 and T2. T1 integrates generation, storage and industrial consumption, while T2 integrates generation, storage and residential consumption. T1 was developed in SINTER.
  • The Huesca Town Hall IDGN: integrates generation, storage and consumption for hydraulic pumping (the Valdabra Reservoir). Previously developed in the SINTER project. In addition, a number of significant buildings belonging to the Town Hall are included, as is the management of the energy balance in the Municipal Tip (the LIFE project with its biogas plant).
  • The Puertollano IDGN: this integrates generation systems, storage and residential consumption. Developed in SINTER.